Relevant Cases
Lianyungang New Orient Container Quay
The Lianyungang RTG Intelligent Remote Control Project is located at the New Orient Container Terminal in Lianyungang, Jiangsu Province. “HIRI FUTURE,” as the provider of the project’s core Intelligent technology solution, has supplied two brand-new RTGs ( CQ08 and CQ10 yard cranes An advanced Intelligent Remote Control System has also been built to support the operation. The project broke ground in mid-April 2025 and completed the preliminary commissioning of equipment in less than three months. Currently, the project has been officially put into operation within the production system, realizing intelligent operational procedures such as issuing instructions from the production management system, automatic equipment positioning, and guided alignment of container trucks. This achievement marks the successful launch of a new pattern of automated operations at the New Oriental Container Terminal, characterized by the deep integration of “intelligent equipment + collaborative systems,” which has significantly enhanced the terminal’s overall level of refined operations and safety.
Due to the uneven terrain in the Stack yard of this Quay, there are stepped height differences as well as transverse and longitudinal settlements, resulting in rail irregularities. This poses certain control difficulties and challenges for first-tier container stacking and trolley deviation correction. HIRI FUTURE addresses this issue by implementing an AI vision protection system that establishes a closed-loop process of “perception → judgment → protection” for RTGs.

